I can't edit a task (or multiple tasks) as described in http://faq.doit.im/mac.html with a right-click anymore in the Mac client. Is that something that went away in the 4.0 version? That would be the only way to change e.g. the priority of multiple tasks at once. Am I missing something or am I doing something wrong?