Which version you refer to here?
And Could you please describe the steps you did to assign a goal to a project or a task?
Now, tasks with a project already cannot be added to a goal. Because the tasks' goal should be consistent with the project's.
Thank you for your feed back and support.
-
04/30/2013 07:54#1PRO
-
04/30/2013 16:05#2PRO
@michelle1987
Hi Michelle,
I have the paid version (v3.7.27 build 20130425). When I open a a task, project or a goal, it does not give me the option to assign a goal to it.
I attempted to drag tasks or projects to a created goal. Sometimes this will work but it most instances it will not allow me to move it.
I was able to move a task without a project in one instance and project with tasks in another instance but there is no rhyme or reason as to why I was able to move these and not others.
Please advise.
Omari Kamal
omarikamal77@gmail.com
312.804.6399 -
05/01/2013 02:24#3PRO
@okamal357
Here is a tutorial image in Attach file, in which describes how to add a project/task to an existing goal.
To drag a project or a task, hover your mouse to the small area (which we call a "drag-and drop" area) in front of it and when the mouse turns cross-shaped, long press the left click and move it to an existing goal on the left-side menu.
If you still have the problem, please feel free to contact us.
So sorry for any inconvenience.