By the way, this is most useful when I have a task "A" set in "Waiting For", and there are several other tasks that can only done after this task A is done. In current mode, I can only set the other tasks as "Waiting For", but they make my "Waiting For" list crowded. So I have problem finding the actual task that is waiting for someone else (and nag them to finish the task).
Sequence of tasks
Hi,
I really like doit.im and am seriously considering signing up for the pro subscription. Somehow to me it just feels better than other GTD apps that I used before.
However, there is one last thing that is ruining my experience on doit.im - sequencing of tasks. I checked online including the previous support forum, and there are many users crying for the feature as much as I do. Just one such request:
http://support.doit.im/entries/508322-Add-dependencies-sequence-of-tasks-
To cut it short, I would like to have a feature that can mark one task as sequence of another. For example, during project planning, I might have 2 sets of directions of tasks to complete that project:
A
--B
----C
D
--E
I can choose to do A or D first, but B can only be done after A complete, and C after B. Same for E, which can only be done after D complete. If all A, B, C, D, E appear in my action list then I will be spending much time analyzing which one that I can do first, while in fact I only have A or D as option. This is the way currently the system sets up and definitely a major time-waster of the system.
I think the easiest way to do this is to have a multi-line input for tasks, then for every line there is a checkbox to select "Is this task sequence of previous task?". Then when user check the box, the system also assign this lot as sequence of the previous task.
When entering single task, the user could have an option to select this task as sequence of any task in the project.
Sorry for the long post :)
Thanks.
I really like doit.im and am seriously considering signing up for the pro subscription. Somehow to me it just feels better than other GTD apps that I used before.
However, there is one last thing that is ruining my experience on doit.im - sequencing of tasks. I checked online including the previous support forum, and there are many users crying for the feature as much as I do. Just one such request:
http://support.doit.im/entries/508322-Add-dependencies-sequence-of-tasks-
To cut it short, I would like to have a feature that can mark one task as sequence of another. For example, during project planning, I might have 2 sets of directions of tasks to complete that project:
A
--B
----C
D
--E
I can choose to do A or D first, but B can only be done after A complete, and C after B. Same for E, which can only be done after D complete. If all A, B, C, D, E appear in my action list then I will be spending much time analyzing which one that I can do first, while in fact I only have A or D as option. This is the way currently the system sets up and definitely a major time-waster of the system.
I think the easiest way to do this is to have a multi-line input for tasks, then for every line there is a checkbox to select "Is this task sequence of previous task?". Then when user check the box, the system also assign this lot as sequence of the previous task.
When entering single task, the user could have an option to select this task as sequence of any task in the project.
Sorry for the long post :)
Thanks.
-
05/02/2013 08:23#1PRO
-
05/02/2013 08:59#2PRO
@khaiyuen
Task dependencies will be supported and it has been listed in our development plan, but it takes time to realize. Please be patient.
Shall you need any help or have additional questions, please feel free to contact us.
Thank you for your feedback and support.
-
05/02/2013 19:16#3PRO
+1
-
05/03/2013 01:31#4PRO
@michelle1987 Thanks for the reply! If so I can use the system with peace in mind knowing that one day it will be even better to use :)
-
05/03/2013 02:57#5PRO
@khaiyuen
You're more than welcome.
Any more questions, please son't hesitate to let us know.