@spirosag
Hi,
It is the correct behaviour. Events in doit calendar will not sync back.
Best regards,
Doit.im Team
When I move an event in Gcal, should the time be changed in doit?
I have set Gcal sync, so the tasks in doit appear in a doit calendar in google calendar. When I move/modify the events in this calendar, the times doesn't change in doitim. Is this the correct behaviour?
-
02/18/2014 03:42#1PRO